CemeTube Concrete Forms Intro
CemeTube Concrete Forming Tubes
concrete forming tube
Cemetube
Ceme-Tube
Ceme-Tube Home Page
Ceme-Tube Concrete Forming Products
Tec/Info on Ceme-Tube Products
CSI Spec Sheet
Installation of Ceme-Tube Products
Ceme-Tube Photo Gallery
Ceme-Tube Training Video
Where To Buy Ceme-Tube
How Ceme-Tube Began
News
Contact Ceme-Tube
ARCAT
McGraw Hill Construction Sweets Network
4 Spec.com
View Brochure
Click Here to Download This Information Sheet PDF »
View Brochure
Click Here to Download This Information Sheet DOC »

An Innovative new product to replace the cardboard forming tube.

Made from partially recycled HDPE plastic, and available in 8”, 10”, 12”, 18”, 24”, and 30” diameters, the new CEME-TUBE™ will change the way footings and piers are made. This revolutionary new product will eliminate a multitude of problems found with using cardboard forming tubes. The CEME-TUBE™ will not only take job site and shipping abuse, but it can be installed, completely backfilled, and filled with concrete at any future date. All CEME-TUBE™s are 4 foot in length, but with the integral collar on one end, can be stacked to produce piers up to 20’ tall in one pour. (12’ tall for 30” model) The finished pier will be round, smooth, equal in diameter, and of architectural grade for the entire length. An optional domed cap is available in all sizes to keep rain, dirt, children etc. out of the hole prior to pouring concrete.

  • Impervious to moisture, before and after pouring.
  • Eliminates “Friction frost heaving” in colder climates.
  • Can be installed, completely backfilled and then filled with concrete at any future date.
  • Can easily handle jobsite and shipping abuse without losing integrity.
  • All models are 4’ in length, but can be stacked to achieve 20’ tall piers and footings. (12’ tall for 30” model)
  • Unlike cardboard tubes, the diameters are uniform from one CEME-TUBE™ to another.
  • Easily cut with common power tools.
  • Easily strippable using a grinder with any type of cutting or grinding wheel.
    Note: When stripping, only cut CEME-TUBE™ approximately 90% through, score inside cut with a utility knife, and tube will split open with minimal effort.
  • Works well for underwater dock piers.
  • Will work in conjunction with manufactured footing bells like Bigfoot.
  • Optional domed top caps are available for all sizes to keep dirt, rain, children, etc. out of hole prior to pouring.
  • Finished pier will be round, smooth, and of architectural grade.
  • No more rotating form lines as with cardboard tubes.

 


Impervious to Moisture!

The CEME-TUBE™ is impervious to adverse weather conditions, including ground water which may seep into the hole prior to pouring concrete. No more waiting to pour due to wet conditions or having to protect the tubes from the weather!


What is Friction Frost Heaving?

Friction frost heaving is caused by the upper 1 to 3 feet or more of the ground freezing. This frozen ground will expand, grip and actually adhere to the pier footing from the sides. When the ground rises up with the frost, it can and will take the pier footing with it.