CONCRETE FORMS AND ACCESSORIES

PART
1 GENERAL
1.1 SECTION INCLUDES
A. Plastic, single use
round forms for cast-in-place concrete applications including
the following:
1.
Concrete piers and footings.
2.
Concrete light pole bases.
3.
Concrete pour-in-place bollards.
1.2 RELATED SECTIONS
A. Section 03300 - Cast-in-Place
Concrete.
1.3 SUBMITTALS
A. Submit under provisions
of Section 01300.
B. Manufacturer's Data:
Product data sheets and installation instructions.
1.4 DELIVERY, STORAGE, AND
HANDLING
A. Delivery: Deliver materials
to site in manufacturer's original, unopened containers and
packaging,
with labels clearly identifying product name and manufacturer.
B. Store forms in accordance
with manufacturer's instructions.
C. Protect forms during
handling and erection to prevent damage.
PART
2 PRODUCTS
2.1 MANUFACTURERS
A. Acceptable Manufacturer:
Ceme-Tube
LLC, which is located at:
2907
Harvey St.
Hudson,
WI 54016
Tel: 715.377.2133
Fax:
715-377-2135
Email:
Web:
B. Substitutions: Not
permitted.
C. Requests for substitutions
will be considered in accordance with provisions of Section
01600.
2.2 CONCRETE PIER FORMS
A. Round Forms for Piers
and Footings: Standard Ceme-Tube by Ceme-Tube with
the
following characteristics:
1.
Material: Heavy duty seamless HDPE plastic, impervious to
moisture.
2.
Appearance: Uniform smooth appearance, without spiral form
lines.
3.
Length: 4 feet (1219 mm).
4.
Diameter: 8 inch (203 mm).
5.
Diameter: 10 inch (254 mm).
6.
Diameter: 12 inch (305 mm).
7.
Diameter: 18 inch (457 mm).
8.
Diameter: 24 inch (610 mm).
9.
Diameter: 30 inch (762 mm).
10.
Diameter: Refer to the drawings.
11.
Domed Cap: Match size of forming tube.
12.
Integral Collar for Bracing and Stacking for Form Diameters
up to 24 Inches:
Integral
collar on one end shall allow units to be braced and stacked
to produce piers or
footings
up to 20 feet (6 meters) tall in one pour.
13.
Integral Collar for Bracing and Stacking for Form Diameter
of 30 Inches:
Integral
collar on one end shall allow units to be braced and stacked
to produce piers or
footings
up to 12 feet (3.7 meters) tall in one pour.
2.3 LIGHT POLE FOOTING FORMS
A. Round Forms for Light
Pole Footings: Light Pole Ceme-Tube by Ceme-Tube with
the
following characteristics:
1.
Material: Reflective yellow color above grade and standard
black color below grade,
heavy
duty seamless HDPE plastic, impervious to moisture.
2.
Appearance: Uniform smooth appearance, without spiral form
lines.
3.
Length: 4 feet (1219 mm).
4.
Diameter: 18 inch (457 mm), with a 15 inch (381 mm) diameter
hole on top of the tube
to
facilitate pouring, finishing and light pole installation.
5.
Diameter: 24 inch (610 mm), with a 17 inch (432 mm) diameter
hole on top of the tube
to
facilitate pouring, finishing and light pole installation.
6.
Diameter: 30 inch (762 mm), with a 17 inch (432 mm) diameter
hole on top of the tube
to
facilitate pouring, finishing and light pole installation.
7.
Integral Collar for Bracing and Stacking for Form Diameters
up to 24 Inches:
Integral
collar on one end shall allow units to be braced and stacked
to produce piers or
footings
up to 20 feet (6 meters) tall in one pour.
8.
Integral Collar for Bracing and Stacking for Form Diameter
of 30 Inches:
Integral
collar on one end shall allow units to be braced and stacked
to produce piers or
footings
up to 12 feet (3.7 meters) tall in one pour.
2.4 BOLLARD FORMS
A. Round Forms for Bollards:
Bollard Ceme-Tube by Ceme-Tube with the following characteristics:
1.
Material: Reflective yellow color above grade and standard
black color below grade,
heavy
duty seamless HDPE plastic, impervious to moisture.
2.
Appearance: Uniform smooth appearance, without spiral form
lines.
3.
Length: 4 feet (1219 mm).
4.
Diameter: 8 inches (203 mm).
5.
Dome Cap: Match size of forming tube.
PART
3 EXECUTION
3.1 EXAMINATION
A. Examine areas to receive
forming tubes. Notify Architect if areas are not acceptable.
Do not
begin erection
until unacceptable conditions have been corrected.
3.2 INSTALLATION
A. Place and brace forming
tubes in accordance with manufacturer's instructions.
B. Erect forming tubes
at locations and to elevations as indicated on the Drawings.
Erect
forming
tubes plumb.
C. Do not use forming
tubes that are damaged or contain defects that could impair
exposed
concrete
surfaces.
D. Place cap or waterproof
sheeting over top of forms to prevent damage to interior surface
by
adverse weather conditions until placement of concrete.
E. Remove forms if necessary
in accordance with manufacturer's recommendations after concrete
has
achieved design strength.
END OF SECTION
|